The Golden Path
"The Singular Dream Pipeline"
This document summarizes the verified lifecycle of a feature from idea to production.
1. The Workbench (Local)
- Environment: Your Machine + Emulator.
- Data: Mock / Seeded.
- Activity:
coding,unit-testing,breaking. - Exit Criteria:
pnpm testpasses. - Action:
git push origin feature/xyz-> PR to Dev.
2. Integration (Cloud Dev)
- Environment: Vercel Preview + Dev DB.
- Data: Junk / Volatile.
- Activity: Automated Testing, Integration checks.
- Exit Criteria: Build succeeds, Integration tests pass.
- Action: Merge
dev-> PR to Staging.
3. The Showroom (Staging)
- Environment: Vercel Preview + Staging DB.
- Data: Clean Golden Data (Seeded).
- Activity: Demos, User Acceptance Testing (UAT), "Magic Link" previews.
- Exit Criteria: Stakeholder Sign-off.
- Action: Merge
stg-> PR to Main.
4. Live (Production)
- Environment: Production.
- Data: Real User Data.
- Activity: Monitoring, Operating.
Version History
| Version | Date | Author | Change |
|---|---|---|---|
| 0.1.0 | 2026-01-29 | Antigravity | Initial Audit & Metadata Injection |