Singular Dream: Strategic Roadmap
[!NOTE] This document is generated from the Future Capabilities Backlog (
generated/future_capabilities.json). It represents the To-Be state of the platform. For the As-Built state, see 06_CAPABILITY_MATRIX.md.
Singular Dream: Composite Strategic Roadmap
PHASE 3: OPERATIONAL HARDENING (The Staging Pivot) Status: Active (Jan 2026) Mandate: "Synchronized Advancement across 4 Dimensions."
This roadmap synchronizes Function, Environment, Data, and Tooling. We cannot advance one without the others.
ποΈ Track 1: Functional (The App)
User-facing capabilities and modules.
| ID | Feature | Dependency | Status |
|---|---|---|---|
| OPS-MAINT-FLOW | Work Order Lifecycle | Env: Staging | π΄ High |
| OPS-VEND-LINK | Vendor Integration | Data: Vendors | π‘ Medium |
| OPS-UAT-SCRIPT | Reviewer Scripts | Data: Residents | π΄ Critical |
π Track 2: Environmental (The Landscape)
Topology and Infrastructure Maturity (ISO-SD-2026).
| ID | Milestone | Definition | Status |
|---|---|---|---|
| ENV-ALIGN-4T | 4-Tier Topology | LOC -> TST -> STG -> MAIN alignment. |
β Done |
| ENV-SEC-DOPPLER | Shared Secrets | TST uses DEV secrets (Shared Resource). |
β Done |
| ENV-STG-FROZEN | Staging Freeze | STG environment locked for UAT cycle. |
π‘ Planning |
πΎ Track 3: Data (The Fidelity)
Volume, Realism, and Narrative Depth.
| ID | Milestone | Target | Status |
|---|---|---|---|
| DAT-SEED-LOC | Workbench Mock | 1 Admin, 1 User (Fast Reset). | β Done |
| DAT-SEED-GOLD | Integration Gold | Deterministic State (Regressions). | β Done |
| DAT-SEED-STAGE | Operation Full House | 50+ Residents, 300+ Ledger Entries. | π In Progress |
| DAT-SEED-ANON | Prod Anonymizer | Scrub scripts for production dumps. | βΈοΈ Deferred |
π οΈ Track 4: Tooling (The Governance)
CI/CD, Monitoring, and Governance Standards.
| ID | Milestone | Definition | Status |
|---|---|---|---|
| GOV-ATC-RADAR | Air Traffic Control | Flight Radar & Branch Hygiene. | β Done |
| GOV-DOC-LINKS | Connected Knowledge | Mandatory Cross-Refs in Templates. | β Done |
| TOOL-LOAD-K6 | Vote Storm Sim | k6 Script for 500 concurrent votes. | π‘ High |
π‘οΈ Track 5: Security (The Shield)
RBAC, Auth, and Threat Mitigation.
| ID | Milestone | Definition | Status |
|---|---|---|---|
| SEC-RBAC-AUDIT | Role Matrix Audit | Verify all 15 User Roles via matrix scan. | π‘ High |
| SEC-AUTH-KIOSK | Lobby Kiosk Mode | Restricted session handling for shared devices. | βΈοΈ Deferred |
| SEC-PEN-TEST | Internal Pen Test | Attempt unauthorized access to Ledger. | π‘ Medium |
π§ͺ Track 6: Testing (The Proof)
Verification logic separate from the code it tests.
| ID | Milestone | Definition | Status |
|---|---|---|---|
| TST-E2E-CRIT | Critical Path E2E | Playwright flows for Vote, Pay, Login. | π’ Stable |
| TST-CHAOS-SIM | Chaos Monkey | Randomly terminate emulator processes during sync. | π‘ Medium |
| TST-PERF-BASE | Baselines | 500ms max latency for Dashboard load. | π΄ High |
Future Horizons (Phase 4 / Wishlist)
Paused until Phase 3 Certification.
- AI: Voicemail Triage, Predictive Telemetry.
- IoT: Voice Broadcasts, Biometric Kiosks.
Version History
| Version | Date | Author | Change |
|---|---|---|---|
| 0.1.0 | 2026-01-26 | Antigravity | Initial Audit & Metadata Injection |